Visual Materials
Borel Powerhouse - Borel
You might also be interested in

Borel Powerhouse - Borel Canal
Visual Materials
Borel Powerhouse - Borel Canal - Placing 3" mesh reinforced concrete floor over existing floor at station 3+00.
photCL SCE 02 - 30548

Borel Powerhouse - Borel Canal
Visual Materials
Borel Powerhouse - Borel Canal - Picture taken on 2/12/1951, first days placement of 3" concrete floor slab near Borel Headworks by Johnson-Western.
photCL SCE 02 - 30547

Borel Powerhouse - Borel Canal
Visual Materials
Borel Powerhouse - Borel Canal - Placing 1.5" thick concrete floor on section lined in 1937.
photCL SCE 02 - 30561

Borel Powerhouse - Kern River - Borel 3rd stage
Visual Materials
Borel Powerhouse - Kern River - Borel 3rd stage - Shows work accomplished on construction of new concrete flume at Tilley #3 prior to canal outage when steel flume can be removed. Concrete piers raised and backfilled for floor slab support with the exception of two center spans which were left open for drainage.
photCL SCE 02 - 40043

Borel Powerhouse - Borel Canal
Visual Materials
Borel Powerhouse - Borel Canal - Placing floor lining.
photCL SCE 02 - 30562

Borel Powerhouse - Borel Canal
Visual Materials
Borel Powerhouse - Borel Canal - Gunite in place South of Borel Bodfish Flume before placing invert concrete.
photCL SCE 02 - 29262