Borel Powerhouse - Borel Canal



You might also be interested in

  • Borel Powerhouse - Borel Canal

    Borel Powerhouse - Borel Canal

    Visual Materials

    Borel Powerhouse - Borel Canal - Placing 1.5" thick concrete floor on section lined in 1937.

    photCL SCE 02 - 30561

  • Borel Powerhouse - Borel Canal

    Borel Powerhouse - Borel Canal

    Visual Materials

    Borel Powerhouse - Borel Canal - Placing gunite canal wall lining at approximate station 25+00 by Johnson-Western.

    photCL SCE 02 - 30542

  • Borel Powerhouse - Borel Canal

    Borel Powerhouse - Borel Canal

    Visual Materials

    Borel Powerhouse - Borel Canal - Placing gunite reinforcement mesh North of Bodfish Flume.

    photCL SCE 02 - 29267

  • Borel Powerhouse - Borel Canal

    Borel Powerhouse - Borel Canal

    Visual Materials

    Borel Powerhouse - Borel Canal - 8" perforated concrete tile under-drain along centerline of canal before backfilling. Picture taken at approx. station 201+00 looking downstream. This section was repaired in 1945

    photCL SCE 02 - 30546

  • Borel Powerhouse - Borel

    Borel Powerhouse - Borel

    Visual Materials

    Borel Powerhouse - Borel - Placing concrete floor slab in cut-over canal

    photCL SCE 02 - 40199

  • Borel Powerhouse - Borel Canal

    Borel Powerhouse - Borel Canal

    Visual Materials

    Borel Powerhouse - Borel Canal - Placing floor lining.

    photCL SCE 02 - 30562