Visual Materials
Florence dam construction
You might also be interested in

Big Creek, Florence Lake Dam
Visual Materials
Big Creek, Florence Lake Dam - Buttresses as poured for winter in temporary spillway.
photCL SCE 02 - 12851

Florence dam construction
Visual Materials
Florence dam construction - Looking towards the cement warehouse showing the butresses and buttress heads in the tempory spillway section.
photCL SCE 10 - 00028

Big Creek, Florence Lake Dam
Visual Materials
Big Creek, Florence Lake Dam - A view of apron as poured in permanent spillway.
photCL SCE 02 - 12852

Big Creek, Florence Lake Dam
Visual Materials
Big Creek, Florence Lake Dam - Channel below Florence Lake spillway with 1000 cfs spill.
photCL SCE 02 - 30719
Image not available
Big Creek: Florence Lake and Dam
Visual Materials
Florence Lake dam: maintenance, including miscellaneous paint samples on arches, test slabs, backcountry Powerhouses, spill of water through Ward Tunnel from Florence Lake, flume collapsed from Ward Tunnel spill, Spillway at Florence Lake Dam cresting with logs and debris caught on drum gates, mountains above Florence Lake, and shots of different stages of construction of Florence Lake Dam. Photographer: Pacific Light & Power Corporation.
photCL SCE

Big Creek, Florence Lake Dam
Visual Materials
Big Creek, Florence Lake Dam - View of spillway taken at 11:30 A.M., giving perhaps a little better view of spill over the drum gates (approx. 1 ft.) and the logs caught on top of same. In order to free the gates of these logs Mr. Panton, who was at the spillway at the time, lowered the gates just enough to allow these logs to be washed over. After this was done, which required only a short time, the gates were raised to their original position.
photCL SCE 02 - 14367