Visual Materials
Construction Photos: Hayfield
You might also be interested in
Image not available
Construction of Transmission Lines of Northern Capistrano
Visual Materials
Construction of Hayfield-Chino Transmission Line, Boulder-Chino Transmission Line, Chino-Capistrano transmission line.
photCL SCE
Image not available
Construction on: Barre
Visual Materials
Construction on: Barre-Lighthipe Transmission Line; Eagle Rock-Gould T/L [replacing single circuit towers with double-circuit towers]; Chino-Laguna Bell T/L - assembling Tower steel, road building, pouring concrete footings, use of "floating" Gin Pole at M5-T1; Pisgah Substation construction - Camp 4, material yard, 2nd Boulder-Chino T/L, control house, operator's cottage.
photCL SCE 13 - vol 105
Image not available
Construction of Barre-Lighthipe Transmission Line and others
Visual Materials
Construction of Barre-Lighthipe Transmission Line; Eagle Rock-Gould Transmission Line [replacing single circuit towers with double-circuit towers]; Chino-Laguna Bell transmission line; Pisgah Substation construction, and Boulder-Chino transmission line.
photCL SCE

Boulder-Chino Transmission Line (3rd) - Road construction
Visual Materials
Boulder-Chino Transmission Line (3rd) - Road construction - Higrove-Chino M5T1.
photCL SCE 02 - 24480

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Transposition at M216-T3 alongside first Boulder-Chino T/L.
photCL SCE 02 - 24424

T3.1 Transportation - Autos, Trucks, & Railcars - Ambulance built for Transmission Line construction
Visual Materials
T3.1 Transportation - Autos, Trucks, & Railcars - Ambulance [built] for Transmission Line [construction] - (Boulder to Chino) - exterior. - at Edison Garage
photCL SCE 02 - 19867