Visual Materials
The first postwar construction at Big Creek saw the installation of a long-planned fourth generator at Powerhouse #3
You might also be interested in

Big Creek was not ignored in postwar resource planning
Visual Materials
Big Creek was not ignored in postwar resource planning. Powerhouse #3 received a fourth unit in 1948. Pg. 208.
photCL SCE 11 - 00415
Image not available
Stone & Webster Engineering Corp. - Big Creek construction photos
Visual Materials
Early construction photographs of Big Creek, including Powerhouse No. 2 construction, including pouring walls and sluicing below Powerhouse No. 2; Camp 7; crushing plant; generator room; Construction at Dams No. 1, No. 2, No. 3 and No. 4; Intake at Dam 1. Photographs by Stone & Webster Engineering Corporation.
photCL SCE

Big Creek Valley Editors Tour: group inside Powerhouse #1 on the generator floor
Visual Materials
Big Creek Valley Editors Tour: group inside Powerhouse #1 on the generator floor.
photCL SCE 05 - 52233

Big Creek Powerhouse #3
Visual Materials
Big Creek Powerhouse #3 - View showing rock crusher, pouring tower and forms at Dam #6 construction site.
photCL SCE 02 - 08317
Image not available
F.P.C. Vol. 3, Projects 67 and 120 - Construction of Big Creek Powerhouse 3 and construction camps
Visual Materials
Construction of Powerhouse 3 and construction camps 1 to 54. Views include Tunnel 3, including intake construction, portal adit Camp 36, Camp 35 adit, outlet portal; Penstock 3 portal structure and manifold, surge chamber, drill sharpeners, connecting 18' penstock to manifold, butterfly valve house, flume to railroad sluicing water at outlet; Tunnel 3 excavation; Surge chamber construction; Construction views of Powerhouse 3, installation of 3 penstocks, turbine and generator installations at No. 3; Construction of 220kV switchyard.
photCL SCE

Big Creek Powerhouse #3
Visual Materials
Big Creek Powerhouse #3 - Placing rotor in third generator at PH #3.
photCL SCE 02 - 09424