Skip to content

OPEN TODAY: 10 A.M.–5 P.M.

Tickets

Visual Materials

Big Creek - Tunnels

1 of 98


You might also be interested in

  • Image not available

    Big Creek: Tunnels

    Visual Materials

    Tunnels 1, 3, and 8, including intake construction at Tunnel 3, portal adit Camp 36, Camp 35 adit, outlet portal, Penstock 3 portal structure and manifold, surge chamber, drill sharpeners, connecting 18' penstock to manifold, butterfly valve house, flume to sluicing water at outlet, guests standing in 18' penstock, sluicing tunnel; Stevenson Creek, Camps 33, 34, 35, 36, 37 and 38 compressors, Camp 38 mess hall, Camp 33; Cascada - Baldwin 15 ton locomotive No. 4; Tunnel 8 construction, Adit 1; Intake at Dam 1 repairs.

    photCL SCE

  • F.P.C. Vol 3, Projects 67 & 120 - Construction Big Creek Powerhouse 3 and construction camps

    F.P.C. Vol 3, Projects 67 & 120 - Construction Big Creek Powerhouse 3 and construction camps

    Visual Materials

    F.P.C. Vol 3, Projects 67 & 120 - Construction Big Creek Powerhouse 3 and construction camps. [Tunnel 3 - intake construction, portal adit Camp 36, Camp 35 adit, outlet portal, Penstock 3 portal structure and manifold, surge chamber, drill sharpeners, connecting 18' penstock to manifold, butterfly valve house, flume to carry sluicing water at outlet, surge chamber, Powerhouse 3 construction, installation of 3 penstocks, turbine and generator installations at PH #3, 220 kV switchyard.]

    photCL SCE 13 - vol 009

  • Image not available

    F.P.C. Vol. 3, Projects 67 and 120 - Construction of Big Creek Powerhouse 3 and construction camps

    Visual Materials

    Construction of Powerhouse 3 and construction camps 1 to 54. Views include Tunnel 3, including intake construction, portal adit Camp 36, Camp 35 adit, outlet portal; Penstock 3 portal structure and manifold, surge chamber, drill sharpeners, connecting 18' penstock to manifold, butterfly valve house, flume to railroad sluicing water at outlet; Tunnel 3 excavation; Surge chamber construction; Construction views of Powerhouse 3, installation of 3 penstocks, turbine and generator installations at No. 3; Construction of 220kV switchyard.

    photCL SCE

  • Big Creek Powerhouse #3 - Tunnel #3 outlet portal

    Big Creek Powerhouse #3 - Tunnel #3 outlet portal

    Visual Materials

    Big Creek Powerhouse #3 - Tunnel #3 outlet portal - excavation for manifold - Camp 37 in background.

    photCL SCE 02 - 08559

  • Stone & Webster Engineering Corp. - Big Creek construction

    Stone & Webster Engineering Corp. - Big Creek construction

    Visual Materials

    Stone & Webster Engineering Corp. - Big Creek construction [Penstock 2, & Powerhouse 2 construction, East portal Tunnel 4, Adit 5, backfill on flowline, incline RR #2, Adit 3 Tunnel 2, 84" flowline installation, site for PH #2, Penstock #1, & Powerhouse 1 construction, installation of Breeches Joint (penstock 1), Tunnel 1 intake.]

    photCL SCE 13 - vol 015

  • Big Creek - Shaver Lake #1

    Big Creek - Shaver Lake #1

    Visual Materials

    Big Creek - Shaver Lake #1 [Shaver Dam construction - original lake bed, logging area of expansion, blacksmith shop, weirs at sawmill, Shaver Lake office and mess hall, original dam, surveys for new dam, Shaver tunnel, Shaver flume from old dam entering tunnel, Eley Creek diversion, intake, penstock, spillway, Adit 8 excavation, flushing tunnel outlet, Shaver Lake Railroad, Camp 11, lumber operations, Camp 19, Shaver cookhouse fire, dismantling Shaver railroad.]

    photCL SCE 13 - vol 037