Visual Materials
Big Creek Powerhouse #3 - Progress picture showing excavating for house sites 20
You might also be interested in

Big Creek Powerhouse #3
Visual Materials
Big Creek Powerhouse #3 - Progress picture from P.O.T. 2 showing top soil storage pile above house #8.
photCL SCE 02 - 40322

Big Creek Powerhouse #3
Visual Materials
Big Creek Powerhouse #3 - Progress picture looking east from house site 5, showing benching for houses 18 to 24 and road fill in front of these houses.
photCL SCE 02 - 40332

Big Creek Powerhouse #3
Visual Materials
Big Creek Powerhouse #3 - Progress picture showing first road fill being placed in front of houses 1 to 4.
photCL SCE 02 - 40321

Big Creek Powerhouse #3
Visual Materials
Big Creek Powerhouse #3 - Progress picture showing completed grading for upper row of houses 16 to 24 inclusive. Pipe for 6" water line strung out prior to trenching in road for installation.
photCL SCE 02 - 40724

Big Creek Powerhouse #3
Visual Materials
Big Creek Powerhouse #3 - Portion of Project 3 Road construction between tunnel outlet (Camp 37), and the SJ&E RR junction (Camp 39) which was constructed in soil covered slopes.
photCL SCE 02 - 07945

Big Creek Powerhouse #3 - Tunnel 3 Outlet
Visual Materials
Big Creek Powerhouse #3 - Tunnel 3 Outlet - Placing concrete in retaining wall. Portion of Camp 37 visible at the top.
photCL SCE 02 - 09200