Chino-Capistrano Transmission Line



You might also be interested in

  • Chino-Capistrano Transmission Line (115kV)

    Chino-Capistrano Transmission Line (115kV)

    Visual Materials

    Chino-Capistrano Transmission Line (115kV) - Assembly of Tower footing (M19-T4) for tower replacement. Cattle guard by anchor location.

    photCL SCE 02 - 23798

  • Chino-Capistrano Transmission Line

    Chino-Capistrano Transmission Line

    Visual Materials

    Chino-Capistrano Transmission Line - Yard at Chino Substation showing new S and A towers.

    photCL SCE 02 - 23201

  • Chino-Capistrano Transmission Line

    Chino-Capistrano Transmission Line

    Visual Materials

    Chino-Capistrano Transmission Line - Wood H-frame 25-1 looking south.

    photCL SCE 02 - 23205

  • Boulder-Chino Transmission Line (2nd)

    Boulder-Chino Transmission Line (2nd)

    Visual Materials

    Boulder-Chino Transmission Line (2nd) - Guard Poles for pulling cables over A.T.&S.F. Railroad near M220-T1. [A steam locomotive is switching track between the guard poles].

    photCL SCE 02 - 23545

  • Chino-Capistrano Transmission Line

    Chino-Capistrano Transmission Line

    Visual Materials

    Chino-Capistrano Transmission Line - Completed single-circuit line.

    photCL SCE 02 - 23223

  • Chino-Capistrano Transmission Line

    Chino-Capistrano Transmission Line

    Visual Materials

    Chino-Capistrano Transmission Line - View of temporary wood pile line connection from M0-T3 to Chino Rack.

    photCL SCE 02 - 23230