Visual Materials
Big Creek PH1
You might also be interested in

Big Creek PH#2
Visual Materials
Big Creek PH#2 - Showing Camp #7 intake to PH #8 tunnel and forebay and Incline #2 bridge across Big Creek. The boom across the forebay was placed there to prevent any timbers, boards, ect., that might be released during PH #2A construction from going down either to the trash rack structure, or over the flashboards of Dam #5.
photCL SCE 02 - 14809

Powerhouse 2A
Visual Materials
Powerhouse 2A - General view down Penstock 2A, showing Camp #7, Dam 5, Powerhouse 8 intake, and the roofs of Plants 2 & 2A.
photCL SCE 02 - 15908

Big Creek Powerhouse #8
Visual Materials
Big Creek Powerhouse #8 - View of Camp 33, Powerhouse #8, and Dam #6 at the peak of PH8 construction. Work just started on Tunnel 3 Intake structure.
photCL SCE 02 - 08299

Big Creek Powerhouse #4
Visual Materials
Big Creek Powerhouse #4 - Intake portal tunnel #2, showing lack of leakage.
photCL SCE 02 - 30709

Big Creek - Early Big Creek
Visual Materials
Big Creek - Early Big Creek [Substations; Big Creek - PH 1 and PH 2 penstock construction, Huntington Lodge & Lake, heavy snowfall, break in PH1 penstock joint, const. Dam #1 & gate tower, Dam 1 spilling, Dam #2 const., Dam #4 const., PH1 const., PH1 interior, PH2 const., PH2 after fire, PH2 interiors (Units & Transformers), unit install PH1, incline RR, railroad locomotives, Big Creek transmission line const.; Magunden Sub.; Kern T/L poles, line and RR wash out at Arroyo Seco; Long Beach Steam Plant; Los Angeles Aquiduct and Powerhouse; PL&P vehicles; Intake Azusa Plant, Azusa PH interior; Highgrove forebay & Powerhouse; Stone Castle; Sierra Powerhouse interior, operator's cottages; Pedley Powerhouse (ext. & int.), Mentone PH; Borel Powerhouse]
photCL SCE 13 - vol 041

Big Creek Powerhouse 2A
Visual Materials
Big Creek Powerhouse 2A - Right half wheel of #1 generator showing new boring machine in place.
photCL SCE 02 - 28792