Visual Materials
Big Creek, Mono-Bear Diversion - Camp 85
You might also be interested in

Big Creek, Mono-Bear Diversion
Visual Materials
Big Creek, Mono-Bear Diversion - Camp 85, which is an adit camp on Bear Creek tunnel. Entrance of adit is between the two small corrugated iron buildings with the pine tree between at right in picture.
photCL SCE 02 - 14395

Big Creek, Mono-Bear Diversion
Visual Materials
Big Creek, Mono-Bear Diversion - Camp 85, Bear Creek.
photCL SCE 02 - 14352

Big Creek, Mono-Bear Diversion - Mono Bear
Visual Materials
Big Creek, Mono-Bear Diversion - Mono Bear - Camp 86 - Intake on Bear Tunnel - note contour at 7350.
photCL SCE 02 - 14329

Big Creek, Mono-Bear Diversion
Visual Materials
Big Creek, Mono-Bear Diversion - Camp 80 located at Mono Intake. Used for construction of Mono Dam and Mono Flow Line.
photCL SCE 02 - 14328

Big Creek - Mono-Bear and Huntington-Shaver diversions
Visual Materials
Big Creek - Mono-Bear and Huntington-Shaver diversions [Construction of Bear Creek Dam & intake structure, and Mono Creek Dam & intake structure, logging area for Mono Creek reservoir, pipeline crossing south fork of San Joaquin River, Camps 71, 72, 73, 80, 81, 82, 83, and 85; Mono-Bear Siphon, back-filled siphon & pipeline, tunnels, pipeline installations, outlets of Mono and Bear Tunnels, intake of Bear Tunnel at Camp 86, Intake of Mono tunnel, Big Creek Siphon, duplex valve on Huntington-Pitman-Shaver conduit & tunnel, intake for conduit at Dam 2, Warehouse, Mess hall and Hospital at Camp 73.]
photCL SCE 13 - vol 038
Image not available
Big Creek: Mono-Bear and Huntington-Shaver Diversions
Visual Materials
Views of Bear Dam, Mono Dam, Mono-Bear pipelines and diversions, and Huntington -Shaver diversions. Construction of Bear Creek Dam and intake structure, and Mono Creek Dam and intake structure, logging area for Mono Creek reservoir, pipeline crossing south fork of San Joaquin River, Camps 71, 72, 73, 80, 81, 82, 83, and 85; Mono-Bear siphon, backfilled siphon and pipeline, tunnels, pipeline installations, outlets of Mono and Bear Tunnels, intake of Bear Tunnel at Camp 86, Intake of Mono tunnel, Big Creek siphon, duplex valve on Huntington-Pitman-Shaver conduit and tunnel, intake for conduit at Dam 2, Warehouse, Mess hall and Hospital at Camp 73.
photCL SCE