Visual Materials
Big Creek Powerhouse #8
You might also be interested in
Image not available
Big Creek: Powerhouse No. 8 (part 1)
Visual Materials
Powerhouse No. 8, Part One. Photographs of Dam 6, Camp 34, Camp 38, overview of Powerhouse 8 and penstock, milling Powerhouse 8 draft tube, operator's cottage, forebay, sluicing tailrace, generator floor, switchboard, rocks washed into tailrace after penstock burst, Unit No. 2 at Pelton Water Wheel Co., generator and governor at Powerhouse 8, penstock vent, transformers and bus, station power sets, switchboard, broken penstock, drilling tunnel No. 8, repaired penstock, steel forebay, Camp 32 cook house, Johnson Valve, Camp 33.
photCL SCE

Big Creek - Powerhouse #8 (part 1)
Visual Materials
Big Creek - Powerhouse #8 (part 1) [Powerhouse 8, Dam 6, Camp 34, Camp 38, overview PH8 & penstock, milling PH8 draft tube, operator's cottage, forebay, sluicing tailrace, generator floor, switchboard, rocks washed into tailrace after penstock burst, Unit #2 at Pelton Water Wheel Co., generator & governor at PH8, penstock vent, transformers & bus, station power sets, switchboard, broken penstock, drilling tunnel #8, repaired penstock, steel forebay, Camp 32 Cookhouse, Johnson Valve, Camp 33.]
photCL SCE 13 - vol 034

Big Creek Powerhouse #8
Visual Materials
Big Creek Powerhouse #8 - Head of penstock before tying on temporary bypass at forebay.
photCL SCE 02 - 07163

Big Creek - Powerhouse 8
Visual Materials
Big Creek - Powerhouse 8 - Break in pressure main. Damage to powerhouse. [building had been temporarily covered with corrigated metal in anticipation of future expansion of the powerplant. Water from the break tore through this surface sending debris and water into the generator room and transformer bay grounding the leads.]
photCL SCE 02 - 07185
Image not available
Big Creek: Powerhouse No. 8 (part 2)
Visual Materials
Powerhouse No. 8, Part Two. Photographs of Powerhouse 8 diversion, excavation for powerhouse, diversion tunnel construction, interior shots of Powerhouse No. 8 (transformers, control room, turbine-generator assembly, station power, Johnson Valve, turbine runner, crane assembly, scroll case assembly, draft tube); Penstock rupture - ripped Penstock, flattened pipe, damage to powerhouse and other facilities, reshaping pipe, adding reinforcing bands to high stress sections of penstock; Camp 33, operator dormitory, substation, incline construction.
photCL SCE
Image not available
Big Creek: Powerhouse No. 1 (part 2)
Visual Materials
Photographs of Powerhouse No. 1, Part Two. Photographs of drying transformers, 220kV bushings, damaged coils, new 220kV nameplates, Klydontograph, 66kV - 30kV construction substation, new 220kV autotransformer installations, hoisting transformers, 220 kV Towers, Substation, ruptured penstock, 4th Unit penstock installation, incline concrete batch cars, tunnel for Unit 4 penstock, 3rd Unit penstock installation, 4th unit flowline, incline hoist.
photCL SCE