Visual Materials
Powerhouse 8
You might also be interested in
Image not available
Big Creek: Powerhouse No. 8 (part 2)
Visual Materials
Powerhouse No. 8, Part Two. Photographs of Powerhouse 8 diversion, excavation for powerhouse, diversion tunnel construction, interior shots of Powerhouse No. 8 (transformers, control room, turbine-generator assembly, station power, Johnson Valve, turbine runner, crane assembly, scroll case assembly, draft tube); Penstock rupture - ripped Penstock, flattened pipe, damage to powerhouse and other facilities, reshaping pipe, adding reinforcing bands to high stress sections of penstock; Camp 33, operator dormitory, substation, incline construction.
photCL SCE

Big Creek Powerhouse 8
Visual Materials
Big Creek Powerhouse 8 - Sections of penstock lying in ditch.
photCL SCE 02 - 06880

Big Creek Powerhouse 8
Visual Materials
Big Creek Powerhouse 8 - Sections of penstock lying in ditch.
photCL SCE 02 - 06879

Powerhouse #8
Visual Materials
Powerhouse #8 - Bagby scraper cutting ditch for incline #8
photCL SCE 02 - 06720

Powerhouse #8
Visual Materials
Powerhouse #8 - Bagby scraper cutting ditch for incline #8
photCL SCE 02 - 06721
