Powerhouse 8 with steel framework completed
You might also be interested in
Image not available
Big Creek: Powerhouse No. 3 (part 1)
Visual Materials
Photographs of Powerhouse No. 3, Part 1. Construction photographs of first forms up on powerhouse, staging and concrete plant, Switching Station, powerhouse steel framework, generator floor, draft tube construction, incline, views from above, penstock construction, Tunnel 3, CO2 equipment on Unit 3, Penstock binding, dispatcher's building, manifold assembly, oil circuit breakers, transformers, Dam 6 spilling, completed Powerhouse 3.
photCL SCE

B1.21 - New Edison Building - Close-up of finished electric arc welded joints on steel framework for new building
Visual Materials
B1.21 - New Edison Building - Close-up of finished electric [arc] welded joints on steel framework for new building.
photCL SCE 02 - 16438

Big Creek Powerhouse #4
Visual Materials
Big Creek Powerhouse #4 - Construction pictures taken by Dam & Tunnel office. [Preparing bedrock for first concrete footing pour - cooling lines and reinforcing steel anchored into bedrock]
photCL SCE 02 - 42276

Boulder-Chino Transmission Line
Visual Materials
Boulder-Chino Transmission Line - [steel rebar for concrete tower supports ready for excavated holes.]
photCL SCE 02 - 20393

Kern River No. 3 - tunnels
Visual Materials
Kern River No. 3 - tunnels - steel concrete forms up [Man standing in steel framework used to hold forms for sides and ceiling of tunnel preparing rock surface for concrete.]
photCL SCE 02 - 05260