Powerhouse #8 - Tunnel interior
You might also be interested in

Powerhouse #8 - Steam Shovel mucking in tunnel - Camp 32
Visual Materials
Powerhouse #8 - Steam Shovel mucking in tunnel - Camp 32 - first daycrew is expanding the "pioneer bore" to full tunnel width.
photCL SCE 02 - 06814

Powerhouse #8
Visual Materials
Powerhouse #8 - 10 machines boring out Pioneer Tunnel at Camp 31
photCL SCE 02 - 06434

Big Creek Powerhouse #8
Visual Materials
Big Creek Powerhouse #8 - Compressors for tunnel driving at Camp 33.
photCL SCE 02 - 08916

Big Creek Powerhouse #8
Visual Materials
Big Creek Powerhouse #8 - View of Camp 33, Powerhouse #8, and Dam #6 at the peak of PH8 construction. Work just started on Tunnel 3 Intake structure.
photCL SCE 02 - 08299

Powerhouse #8
Visual Materials
Powerhouse #8 - Commissary at Camp 32. [A young man is beind the counter next to cash register with shelves full of canned of peaches, pears, apricot jam, condensed milk....]
photCL SCE 02 - 06549
Image not available
Big Creek: Powerhouse No. 8 (part 2)
Visual Materials
Powerhouse No. 8, Part Two. Photographs of Powerhouse 8 diversion, excavation for powerhouse, diversion tunnel construction, interior shots of Powerhouse No. 8 (transformers, control room, turbine-generator assembly, station power, Johnson Valve, turbine runner, crane assembly, scroll case assembly, draft tube); Penstock rupture - ripped Penstock, flattened pipe, damage to powerhouse and other facilities, reshaping pipe, adding reinforcing bands to high stress sections of penstock; Camp 33, operator dormitory, substation, incline construction.
photCL SCE